Mitchell’s Scaffolding Ltd
Portfolio

Burnley Water Treatment Plant

Location: Burnley Lancashire

The Scaffold works required on this project were Planned well in advance to ensure the work went through with the minimum of interruption to the water treatment plant itself.

On the 10th of February 2016 one gang attended site to undertake the scaffold works at 6 am. The scaffold erected was to access the flue and other associated pipe works the project demanded.

Vehicle access could have been an issue given the need to park so close to the erection point on the access road, but the time and planning that went into the pre start, guaranteed that everything from parking induction and erection went without a hitch.

Gated access tower erected to gain access to the low level flat roof with a 2 sided hand-railed walkway installed across the single story building to prevent falls with handrails added to the perimeter of the  adjacent building.  Job done  

 

© 2024 Mitchell’s Scaffolding Ltd. All rights reserved.
https://www.mitchellsscaffolding.co.uk/portfolio/accrington-water-treatment-panlt.html

Page updated 16th Sep 2020, 10:51

Designed and maintained by Brick technology Ltd.
BRICK | Instant Websites